Most homeowners start planning too late. Use our timeline planner to work backwards from your target completion date and see exactly when each phase needs to begin.

Calculate Your Start Date

What Happens at Each Stage

A typical full villa renovation, week by week. Bathroom and kitchen timelines are condensed versions of this same sequence.

Week 1-2 — Pre-Construction

Design Finalisation & Material Orders

Final design sign-off, material selections locked, NOC application submitted. This is when tile, marble, fixtures, and cabinetry are ordered — some materials have 3-4 week lead times, so delays here cascade through the entire project.

Week 3-4 — Demolition & Rough Works

Strip-Out & Structural Prep

Demolition of existing finishes, plumbing rough-in, electrical rewiring, waterproofing. The villa will look worse before it looks better — this is normal. Your project manager sends daily WhatsApp photo updates so nothing is a surprise.

Week 5-8 — Core Works

Tiling, Joinery & Glass Installation

Floor and wall tiling, kitchen and wardrobe installation, glass enclosures and partitions fitted. This is where the vision starts to come together. Each trade works in sequence — our in-house team means zero coordination delays between subcontractors.

Week 9-12 — Finishing

Paint, Fixtures & Detail Work

Painting, lighting installation, sanitaryware fitting, hardware, final glass polishing. Every detail is checked against the original design specification. Your dedicated project manager walks the site with the snagging list.

Week 13-14 — Handover

Deep Clean & Final Walkthrough

Professional deep clean, client walkthrough, snagging corrections (if any), handover documentation. You receive your 1-year craftsmanship warranty certificate and maintenance guide. Move-in ready.

Pro Tip: Summer is the Best Time to Renovate in Dubai

Most families travel June-August. Start your renovation before you leave and come home to a transformed villa. We manage everything while you're away — daily photo updates on WhatsApp.

Talk to us about summer scheduling