DESIGN & APPROVALS

Engineering Drawings

Structural, MEP, and shop drawings — the backbone of every build.

Before You Start

Why Engineering Drawings Are the Most Critical Investment in Your Build

Architectural drawings show what a building looks like. Engineering drawings determine whether it stands up, functions properly and passes inspection. Without accurate structural calculations, your foundation could be over-engineered (wasting tens of thousands of dirhams) or under-engineered (creating genuine safety concerns). Without coordinated MEP drawings, your air conditioning ducts will clash with structural beams, drainage runs will conflict with electrical conduits, and your contractor will be forced to improvise solutions on site — always at your expense.

The consequences of poor MEP coordination are particularly severe in Dubai's climate. HVAC systems in a typical villa represent 30-40% of the total MEP cost. When duct routes are not properly planned around structural elements, the system loses efficiency, ceiling heights are compromised, and maintenance access becomes impossible. We have remediated dozens of projects where the original engineering was done cheaply or not at all, and the cost of fixing these issues mid-build is always three to five times what proper engineering would have cost upfront.

Shop drawings bridge the gap between design intent and construction reality. They are the detailed fabrication and installation drawings that tell tradespeople exactly how to build each element — from steel connections to joinery details to curtain wall interfaces. Without them, every subcontractor interprets the design differently, leading to inconsistencies, rework and disputes.

  • Structural miscalculations waste money or compromise safety
  • Uncoordinated MEP systems cause clashes and rework on site
  • HVAC represents 30-40% of MEP cost — routing matters
  • Shop drawings eliminate interpretation errors by subcontractors
  • Proper engineering pays for itself many times over during construction
engineering drawings, Dubai
How We Do It Differently

Engineering Excellence, Every Detail

🏗

Structural Engineering

Foundation design, reinforced concrete detailing, steel frame calculations and structural assessments for new builds and renovations. Every element calculated to UAE building codes and optimised for cost efficiency.

MEP Coordination

Mechanical, electrical and plumbing systems designed as an integrated whole — not three separate disciplines working in isolation. Duct routes, cable trays, pipe runs and drainage all coordinated to eliminate site conflicts.

📐

Shop Drawings

Fabrication-ready drawings for every trade — steel, aluminium, joinery, glazing and MEP installations. Each drawing includes dimensions, material specs, connection details and installation sequences.

📊

Quantity Surveying

Accurate bill of quantities extracted directly from engineering drawings. No estimating, no rounding up — exact quantities that enable precise costing and eliminate material waste on site.

🔍

Clash Detection

BIM-based clash detection identifies every conflict between structural, mechanical, electrical and plumbing systems before construction begins. We resolve clashes on screen where changes cost nothing.

Authority Compliance

All engineering drawings comply with UAE building codes, Dubai Civil Defence requirements, DEWA regulations and relevant international standards. Produced by licensed engineers with full professional indemnity.

Investment Guide

Engineering Drawings Pricing

Structural Only

AED 20,000 - 40,000
  • Structural assessment (existing buildings)
  • Foundation design and detailing
  • Reinforced concrete drawings
  • Steel frame calculations
  • Structural engineer certification
  • Authority submission set
Get a Quote

Complete Engineering Package

AED 100,000+
  • Everything in Full MEP + Structural
  • Shop drawings for all trades
  • Full quantity surveying
  • Construction supervision support
  • As-built documentation
  • Ideal for new builds and major projects
Get a Quote

Every quote is fully itemised. No hidden costs. No surprises.

Your Journey

How It Works

1

Assessment

We review architectural drawings, conduct site surveys and structural assessments, and define the full engineering scope for your project.

2

Engineering Design

Structural calculations, MEP system design and coordination. All disciplines developed in parallel using BIM for seamless integration.

3

Clash Detection & Review

Full BIM clash detection followed by a detailed review with you. Every conflict resolved on screen before a single pipe or beam is installed.

4

Submission & Approval

Final engineering drawings submitted to authorities, shop drawings issued to contractors, and quantities provided for accurate pricing.

Common Questions

Engineering Drawings FAQ

What are MEP drawings and why do I need them?
MEP stands for Mechanical, Electrical and Plumbing. These drawings show the routing of all building services — HVAC ducts, electrical wiring, water supply, drainage and fire protection systems. Without proper MEP drawings, services clash with structural elements during construction, causing expensive rework and delays. In Dubai's climate, where air conditioning is critical, poorly routed HVAC systems can reduce efficiency by 20-30% and compromise ceiling heights throughout your home.
How long do engineering drawings take to complete?
Structural drawings for a standard villa take 2-4 weeks. A full engineering package including MEP and shop drawings typically takes 6-10 weeks depending on project complexity. We provide a detailed schedule at project start and maintain regular progress updates throughout the process.
Do you handle engineering for renovation projects?
Yes, and renovation engineering is actually more complex than new-build work. We must assess the existing structure, identify load-bearing elements, evaluate existing MEP systems and design new work that integrates safely with what is already there. We conduct thorough structural assessments before producing any drawings to ensure safety and compliance.
What is clash detection and why does it matter?
Clash detection uses BIM (Building Information Modelling) software to create a virtual 3D model of your entire building — structure, ducts, pipes, cables and all. The software automatically identifies every point where two systems conflict. Finding clashes on screen costs nothing. Finding them on site costs thousands in rework, delays and wasted materials. For a typical villa project, clash detection identifies 50-200 conflicts that would otherwise be discovered during construction.
Are your engineering drawings accepted by Dubai authorities?
Absolutely. All engineering drawings are produced by licensed engineers and comply with UAE building codes, Dubai Municipality requirements, Dubai Civil Defence regulations and relevant international standards including BS and ASHRAE. We handle the submission process and manage any authority queries or revision requests.

Need Engineering Drawings for Your Project?

Whether it is structural calculations for a renovation or a complete MEP package for a new build, our engineers are ready to deliver drawings that keep your project on track.