Real pricing from 800+ completed projects across Dubai's premium communities. Updated February 2026.
Kitchen renovations are consistently the highest-ROI room upgrade in Dubai. Costs vary significantly based on layout complexity, material grade, and appliance selection.
| Scope | Essential | Premium | Luxury |
|---|---|---|---|
| Galley / small kitchen | AED 45,000–65,000 | AED 65,000–120,000 | AED 120,000–180,000 |
| L-shape / standard | AED 60,000–85,000 | AED 85,000–150,000 | AED 150,000–220,000 |
| U-shape / island | AED 80,000–120,000 | AED 120,000–200,000 | AED 200,000–350,000 |
| Open-plan + island + butler's pantry | AED 100,000–160,000 | AED 160,000–280,000 | AED 280,000–500,000+ |
| Material | Cost / sqm | Notes |
|---|---|---|
| Laminate countertop | AED 200–400 | Budget option, 5-year lifespan |
| Engineered stone (Caesarstone) | AED 600–1,200 | Most popular in Dubai, stain-resistant |
| Natural marble (Calacatta) | AED 1,500–3,500 | Statement piece, requires sealing |
| Porcelain slab | AED 800–1,800 | Looks like marble, zero maintenance |
Bathrooms deliver the most dramatic transformations. A dated 2008 bathroom can become a spa-like retreat in 4–6 weeks.
| Scope | Essential | Premium | Luxury |
|---|---|---|---|
| Powder room / guest WC | AED 15,000–25,000 | AED 25,000–45,000 | AED 45,000–70,000 |
| Standard bathroom | AED 35,000–55,000 | AED 55,000–90,000 | AED 90,000–140,000 |
| Master ensuite | AED 50,000–80,000 | AED 80,000–130,000 | AED 130,000–200,000 |
| Master + walk-in shower + freestanding tub | AED 70,000–110,000 | AED 110,000–180,000 | AED 180,000–300,000+ |
Turnkey villa renovation covers everything from demolition to handover. Pricing depends heavily on villa size, community, and scope.
| Villa Size | Essential | Premium | Luxury |
|---|---|---|---|
| 2–3 BR townhouse | AED 120,000–250,000 | AED 250,000–450,000 | AED 450,000–700,000 |
| 4 BR villa | AED 200,000–400,000 | AED 400,000–700,000 | AED 700,000–1,200,000 |
| 5–6 BR villa | AED 350,000–600,000 | AED 600,000–1,000,000 | AED 1,000,000–2,000,000 |
| Signature / mansion | AED 500,000+ | AED 1,000,000+ | AED 2,000,000+ |
Not all communities are created equal. Access restrictions, material transport logistics, and HOA requirements all affect pricing.
| Community | Premium | Why |
|---|---|---|
| Arabian Ranches | Baseline | Standard access, no premium |
| Dubai Hills Estate | +5–10% | Emaar HOA requirements |
| Jumeirah Golf Estates | +10–15% | Gated access, larger villas |
| Palm Jumeirah | +20–25% | Island access, material transport, security clearance |
| Al Barari | +25–30% | Strict HOA, premium finishes expected |
| Emirates Hills | +30–35% | Ultra-premium standard, complex logistics, security protocols |
| Item | Price Range (AED) |
|---|---|
| Frameless shower enclosure (standard) | 3,500–7,000 |
| Frameless shower enclosure (custom) | 7,000–15,000 |
| Glass balustrade (per linear metre) | 1,200–2,500 |
| Glass partition wall | 800–2,000 per sqm |
| Aluminium sliding doors (per panel) | 4,000–12,000 |
| Skylight | 8,000–25,000 |
| Scope | Price Range (AED) |
|---|---|
| Retiling + replastering | 40,000–80,000 |
| Full renovation (tile + equipment + deck) | 80,000–180,000 |
| New pool construction | 120,000–350,000+ |
| Infinity edge upgrade | +50,000–120,000 |
| Milestone | % | What Should Be Complete |
|---|---|---|
| Contract signing | 10% | Secures slot, begins material ordering |
| Demolition + rough works | 30% | Site cleared, plumbing/electrical roughed in |
| Finishing stage | 40% | Tiling, joinery, fixtures installed |
| Handover | 20% | Snagging complete, final walkthrough approved |
This guide gives you ranges. A free site visit gives us everything we need for an exact, itemised quote — no obligation.
💬 Book Free Site Visit on WhatsAppOr call: +971 52 645 5121
© 2026 First Unicorn Interiors. All pricing is indicative and subject to site conditions. Prepared by Commander Bond — 15+ years UAE construction experience.